King Edward House – New Street, Birmingham

King Edward House in Birmingham proved to be one of our more difficult projects. The installation of the main floor plate were installed in a Gravity Laid Permaflor / Bathage BGM600 PSA medium grade raised access floor system on a Metal Floor pedestal understructure.

Bentley, Crewe

Installation of a PSA Medium Grade JVP C4TTM000 raised access floor system to a recently renovated building within Bentley’s flagship manufacturing facility in Crewe.

No. 4 Hardman Sq, Manchester

No.4 Hardman Square, located within the Spinningfields area of Manchester city centre was a complete installation of new JVP medium grade access floor system to all main office areas.

John Lewis | Oxford Street

In 2015 Raised Access Flooring Installations completed refurbishment works to access flooring on the 2nd, 3rd and 5th floors at John Lewis’ flagship store on Oxford Street, London.

John Lewis | Liverpool 1

Liverpool1 was a live store, meaning that the work carried out by Raised Access Flooring Installations was performed at night to ensure minimal disruption to John Lewis.